Contango installs weighbridge at Muchesu Coal Project
Published by Will Owen,
Editor
World Coal,
Contango Holdings Plc has confirmed that the installation of the weighbridge at the Muchesu Coal Project has been completed and is now fully operational.
The completion of the installation of the weighbridge enables trucks to collect coal from Muchesu and meets the necessary standards for the sale and transportation of bulk commodities in Zimbabwe and beyond, as well as confirming the tonnages and subsequent sales totals.
Production is ongoing and a sizeable stockpile has been built. The company expects to announce first sales and receive first revenues this month from TransOre International FZE, as previously announced.
Read the article online at: https://www.worldcoal.com/handling/08082023/contango-installs-weighbridge-at-muchesu-coal-project/
You might also like
Is carbon capture and utilisation a future revenue stream for coal regions?
Rising carbon capture and utilisation technologies offer coal regions a profitable future. The transition is a catalyst for high-paying jobs and new markets while leveraging the industry’s existing deep expertise.