B&W awarded power plant reheater replacement contract
Published by Harleigh Hobbs,
Editor
World Coal,
Babcock & Wilcox Enterprises, Inc.’s subsidiary the Babcock & Wilcox Co. (B&W) has been awarded a contract for more than US$18 million to engineer, manufacture and install a replacement reheater at Xcel Energy’s Pawnee Generating Station near Brush, Colorado, US.
The components, which include horizontal and vertical reheater banks, will be manufactured in B&W’s Monterrey, Mexico facility and are scheduled for delivery in February.
“Xcel Energy is a long-time B&W customer, and we value our strong professional relationship,” commented B&W Global Services Division Sr. Vice President Mark Low. “We believe our technically advanced design will offer a significant improvement in the operation of the unit.”
Low continued: “We appreciate the confidence Xcel Energy has shown in B&W and our service capabilities.”
The B&W reheater also features redesigned wall attachments that will facilitate simpler and faster installation.
The 500 MW Pawnee Unit 1 start up is scheduled for May 2016.
Edited from press release by Harleigh Hobbs
Read the article online at: https://www.worldcoal.com/power/22022016/babcock-and-wilcox-win-power-plant-reheater-replacement-contract-282/
You might also like
EIA reduces its forecast for US coal exports following Port of Baltimore closure
The US EIA has decreased its forecast for US coal exports following the collapse of the Francis Scott Key Bridge and the resulting closure of the Port of Baltimore.