NTPC provides coal operation update
NTPC Ltd has suffered an estimated production loss of 900 000 t of coal in September as operations at the Pakri-Barwadih mines were completely halted.
NTPC Ltd has suffered an estimated production loss of 900 000 t of coal in September as operations at the Pakri-Barwadih mines were completely halted.
Vostochnaya Mining Co. has launched a pilot project to equip cars with the Antison video surveillance system with the function of monitoring the driver's condition.