Europe’s first bioenergy carbon capture and storage pilot underway at Drax Power Station
If successful, the six-month pilot project will capture a tonne of CO2 a day from the gases produced when renewable power is generated using biomass at Drax.
If successful, the six-month pilot project will capture a tonne of CO2 a day from the gases produced when renewable power is generated using biomass at Drax.