NTPC installed capacity reaches 57 106 MW
NTPC’s installed capacity now reaches 57 106 MW, with two 660 MW units at Tanda and Khargone super thermal power plants.
NTPC’s installed capacity now reaches 57 106 MW, with two 660 MW units at Tanda and Khargone super thermal power plants.