CD Cargo takes over supply of Werndorf power plant
                            
                                
                                
                                        
                                            
                                        
                                
                                    
                                        Published by Claire Cuddihy,
                                        Assistant Editor
                                        
                                    
                                World Coal,
                                
                            
                        
On 1 April, shortly after 1 p.m., the complete train consisting of the CD Cargo Falls wagons loaded with coal for the local power plant, stopped at the Werndorf station in Styria.
At the head of this train was a pair of CD Cargo Vectrons - 383.001 and 008, which was assisted in part of the route by the banking engine 383.002. Coal trains should travel from Ostrava to Werndorf several times a week.
Read the article online at: https://www.worldcoal.com/power/02042019/cd-cargo-takes-over-supply-of-werndorf-power-plant/
You might also like
US DOE announces loan for Indiana coal-powered fertilizer facility
US Secretary of Energy Chris Wright has announced the Department of Energy’s (DOE) Loan Programs Office (LPO) recently closed a loan to support independent, American-made, coal-powered fertilizer production.
 
                                