Skip to main content

Curragh mine coal production jumps in 3Q15

Published by , Editor
World Coal,


Coal production at Wesfarmers’ Curragh mine was up 5.7% in 3Q15 compared to the previous quarter at 3.31 million t. Of this, 2.37 million t was metallurgical coal, representing a 2.6% rise, while 941 000 t was steam coal – a 14.5% rise.

Overburden removal was 13.5% down on the previous quarter.

For the twelve months to the end of September, metallurgical coal production was down slightly on the previous twelve months by 0.5% to 9.15 million t. Thermal coal production was down 6.4% to 3.29 million t.

Edited by .

Read the article online at: https://www.worldcoal.com/mining/23102015/curragh-mine-coal-production-jumps-in-3q15-3059/

You might also like

 
 

Embed article link: (copy the HTML code below):