Curragh mine coal production jumps in 3Q15
Published by Jonathan Rowland,
Editor
World Coal,
Coal production at Wesfarmers’ Curragh mine was up 5.7% in 3Q15 compared to the previous quarter at 3.31 million t. Of this, 2.37 million t was metallurgical coal, representing a 2.6% rise, while 941 000 t was steam coal – a 14.5% rise.
Overburden removal was 13.5% down on the previous quarter.
For the twelve months to the end of September, metallurgical coal production was down slightly on the previous twelve months by 0.5% to 9.15 million t. Thermal coal production was down 6.4% to 3.29 million t.
Edited by Jonathan Rowland.
Read the article online at: https://www.worldcoal.com/mining/23102015/curragh-mine-coal-production-jumps-in-3q15-3059/
You might also like
Duke Energy Indiana agrees to Cayuga coal unit feasibility study
Duke Energy Indiana has agreed to perform an engineering study to evaluate the technical feasibility of continued operation of the site’s current coal units by third parties interested in purchasing them.