Successful installation of CSU at Haranchi thermal coal-fired power plant
BigLift Shipping’s Happy Buccaneer successfully transported and installed a 1200 t 45 m high continuous ship unloader from Kaohsiung, Taiwan, to the Haranchi thermal power plant in Japan.